Automatic 5 Gallon oil Pet Bottle Blowing Machine
Features:
A. Stable performance with advanced PLC.
B. Conveying preforms automatically with conveyor.
C. Strong penetrability and good and swift distribution of the heat by letting the bottles rotate by itself and revolute in the rails simultaneously in the infrared preheater.
D. High adjustability to enable the preheater to preheat preforms in shapes by adjusting the light tube and the length of the reflecting board in the preheating area, and eternal temperature in the preheater with an automatic thermostatic apparatus.
E. High safeties with security automatic-locking apparatus in each mechanical action, which will make the procedures turn into a state of safety in case of a breakdown in certain procedure.
F. No contamination and low noise with the air cylinder to drive the action instead of the oil pump.
G. Satisfaction with different atmospheric pressure for blowing and mechanical action by dividing the blowing and action into three parts in the air pressure diagram of the machine.
H. Strong clamping force with high pressure and double crank links to lock the mold.
I. Two ways of operating: Automatic and manual.
J. Safe, reliable, and unique design of the position of valve to make the air pressure diagram of the machine easier to understand.
K. Low cost, high efficiency, easy operation, easy maintenance, etc, with automatic technological process.
L. Contamination is avoided for the bottle body.
M. Ideal effect of the chilling with the chilling system.
N. Easy installation and starting
O. Low rejection rate: Less than 0.2 percent.
Main constituent parts of full-automatic blow moulding machine
Working valve: ARK(South Korean)
Cylinder: AirTAC(Taiwang)
PLC: Siemens(German)
Computer Board: WEINVIEW(Taiwang)
Relay: OMRON(Japan)
container volume(ml) | 1500 |
Electrical system(V) | 380v/50-60Hz |
Cavity | 1 |
Max diameter(mm) | 93 |
clamping stroke(mm) | 120 |
mold thickness(mm) | 160 |
stretching stroke(mm) | 450 |
theoretical output(pcs) | 2400 |
Weight (KGS) | 2000 |
The total measure area | 2720*3400mm |
Main machine size | 2720*1440*2060mm |
Loading machine size | 1700*1100*2400mm |
Power(kw) | 50 |
Use power(kw) | 20 |
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.
Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight