Machine Feature:
The bottles are picked up by the infeed starwheel and transferred to the bottle table. The bottle rotation begins when they are positioned between bottle plates and centering bells.
The speed of the feed roller is adjusted to the required label length for continuous web tension. A standard threading unit ensures optimal film feed. In the cutting unit, the labels are precisely cut while a PLC command and servo-motor provide an exact cut-off point.
Two narrow strips of hot melt glue the labels together, which are applied by a heated glue roller to the leading and trailing label edges. The label with the glue strip on its leading edge is transferred to the container. This glue strip ensures an exact label positioning and a positive bond. As the container is rotated during label transfer, labels are applied tightly. Gluing of the trailing edge ensures proper bonding.
Technical Parameters :
Name | OPP Hot Melt Labeling Machine |
Power supply | Three-phase 380V 60 Hz 5000W |
Machine dimensions: | 3650mm×1700mmX 2010mm(can be adjusted by customer requirements) |
Method of speed adjustment: | uninterrupted - adjust rate |
Labeling precision: | ±1mm |
Labeling speed | 4000-15000bph |
Maximum label width: | 200mm(standard width, can be adjusted ) |
The maximum outer diameter of label | 600mm |
Paper core Hot melt | 152 mm |
Labeling glue: | glue at both ends of each label with hot melt |
Gluing temperature: | 120~160ºC |
Labeling type for products: | suitable for round or square containers made of plastic, metal, glass |
Type of label: | opp, bopp ,paper-plastic composite film ,paper label |
Labeling stations: | 12per cycle |
Machine weight: | about 3000 kg |
Mechanical Parts:
Transportation institution | TRANSTECNO motor 750W(with deceleration by TRANSTECNO ), inverter speed control |
Conveyor | Italy FLEXON LF820-K325 industrial nylon chain plate conveyor |
Mainframe transportation institution | TRANSTECNO motor 2.2Kw (with deceleration by TRANSTECNO) |
Sub bottle institution | industrial worm sub bottle institution |
Into bottle institution | with worm sub bottle institution and starwheel position feeding institution to ensure the accuracy and stability of loading |
Position institution | Mechanical pre-location , using the camwheel institution to planish the bottle for label positioning |
Labeling institution | Containers are pick up by rotary wheel ,labeling during the rotation. |
Supply label institution | high speed servo opp label supply system (drive by servo-motor) |
Pressing label institution | Arc brush unit |
Guided bottle institution | adjust by double coordinate section guide rail |
Glue supply system | hot melt glue supply system(German SEIMEC control system) ensures the accuracy and uniformity of gluing |
Safety part:
Safety protection | In order to keep the operator safety ,when the machine is running please close the protective doors |
Lack of label alarm | Set an alarm to remind the operator to change the label when the label will be use out |
Lack of bottle alarm | When lack of the bottle the machine will stop and make an alarm .The machine will restart automatically as soon as the bottles have been put that will facilitate on-line production |
Leak of labeling alarm | To control the quality of labeling |
Pressure testing | When the pressure can not meet the equipment requirement ,the machine will stop to against bad products produce |
Vacuum testing | When the vacuum can not meet the equipment requirement ,the machine will stop to against bad products produce |
Temperature testing | When the temperature can not meet the equipment requirement , the machine will stop to against bad products produce |
Packing and Shipping:
Factory:
Our servies:
Before the order:
We will make detailed solution for you based on your requirments.
We will send you videos of our products to know more about our machines.
If you are willing to visit our factory,we will pick you up at a nearby airport/station.
After the order:
We will start to produce machines and update the progress.
Our engineer will draw the layout for you.
After-sales service:
Arrange our engineer to your factory to install machines if you need,train your employee until they can operate machines well.
Provide you 2 years warranty with spare parts 2 year free.
24 hours for engineer response (all services part 5days in customer hand by Intl' courier)