Plastic film & bag recycling and washing line (1000kg/h):
Belt conveyor*2→Crusher (with water) *2→ Double screw conveyor*2→Film floating washer→ Screw conveyor→ High speed friction machine→ Screw conveyor→ Horizontal dewatering machine→ Drying system→ Transition silo→ Drying system→ Storage hopper→ Control cabinet
Advantages:
1. Final products has good quality. When process PP PE film bags, Water content<=8%
2. The whole line capacity between 200kg/h-2000kg/h (200kg/h, 300kg/h, 500kg/h, 1000kg/h)
3. Parts which contact material use SUS304, thickness more than 3mm, ensure long service lift time
4. World famous brand components applied on the production line- SKF bearing, Siemens contactor, RKC temperature, ABB inverter, Siemens PLC control etc
5. The whole production line with CE certification, ISO9001 certification
Technical parameter:
Belt conveyor*2→Crusher (with water) *2→ Double screw conveyor*2→Film floating washer→ Screw conveyor→ High speed friction machine→ Screw conveyor→ Horizontal dewatering machine→ Drying system→ Transition silo→ Drying system→ Storage hopper→ Control cabinet
Advantages:
1. Final products has good quality. When process PP PE film bags, Water content<=8%
2. The whole line capacity between 200kg/h-2000kg/h (200kg/h, 300kg/h, 500kg/h, 1000kg/h)
3. Parts which contact material use SUS304, thickness more than 3mm, ensure long service lift time
4. World famous brand components applied on the production line- SKF bearing, Siemens contactor, RKC temperature, ABB inverter, Siemens PLC control etc
5. The whole production line with CE certification, ISO9001 certification
Technical parameter:
Plastic PP PE film/bag recycling washing line main components(1000kg): | ||
Name | Quantity | Power |
Belt conveyor | 2sets | 2.2kw*2 |
Crusher | 2sets | 55kw*2 |
Screw conveyor | 2sets | 3kw*2 |
Floating washer | 1set | 3kw+3kw+3kw |
Screw conveyor | 1set | 5.5kw |
High speed frication machine | 1set | 45kw |
Screw conveyor | 1set | 5.5kw |
Horizontal dewatering machine | 1set | 110kw +1.5kw |
Drying system-1 | 1set | 48kw+11kw |
Transition storage hopper | 1set | / |
Drying system-2 | 1set | 36kw+11kw |
Storage hopper | 1set | 1.5kw+1.5kw |
Control cabinet | 1set | / |
Detailed image
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 45-60 days if the goods are not in stock, it is according to what kind of machine you need
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: 30% T/T in advance ,70% balance before shipment or Negotiable
If you have another question, please feel free to contact us as below
Our serives
We will test machines in our factory before delivery. Customer check machines running in our factory, after customer is fully satisfied with the quality, then delivery, when machines arrive in customer's factory, we will send our engineer to test the machine in customer's factory
We supply machines technical support, material formulation; guarantee machines and spare parts supply
Contact us
Company name: Zhangjiagang Camel Machinery Co.,ltd
Address: Yongli Economic development zone, LeYu town, Zhangjiagang city, Jiangsu province, China
Tel: +86-512-58539862 Fax: +86 -512-58539863
Mobile : 0086 13222230431
Website: camelmachinery.en.made-in-china.com